On-site generation engineered to your consumption profile — reducing your electricity bill from day one and paying back within 4–6 years.
Book a Free Site Survey How it worksUK commercial electricity tariffs now regularly exceed 25p/kWh for SMEs. A well-designed rooftop solar system generates electricity at an effective cost of under 6p/kWh over its operational lifetime — a structural cost advantage that compounds every year as grid prices rise.
For commercial property owners with large roof areas — warehouses, logistics centres, industrial units, retail parks — the economics are particularly strong. High daytime electricity consumption aligns naturally with peak solar generation periods, maximising self-consumption and minimising export.
Beyond direct savings, MCS-certified installations qualify for the Smart Export Guarantee (SEG), providing a revenue stream for surplus electricity exported to the grid. Combined with battery storage, export can be minimised in favour of peak-period self-consumption — further improving returns.
Figures are indicative. Actual performance depends on roof orientation, shading, consumption profile and grid tariff. Your free site survey produces a site-specific model.
Structural roof assessment, shading analysis, grid connection review and consumption profile analysis. Conducted at no charge, no obligation.
Bespoke array layout, inverter sizing, string configuration and yield modelling. Designed to maximise self-consumption against your specific load profile.
25-year cash flow projection, NPV, IRR and payback analysis. Scenario modelling under different tariff assumptions. Presented clearly, not buried in spreadsheets.
Distribution Network Operator (DNO) applications managed end-to-end, including G99 notification, export limiting and metering arrangements where required.
Installation to BS7671 and the IET Code of Practice for Grid Connected Solar PV Systems. MCS certification required for SEG eligibility and warranty validity.
Generation monitoring system commissioned and configured. Smart Export Guarantee application submitted to your chosen licensed SEG tariff provider.
We visit your site and review 12 months of energy bills. We assess roof condition, orientation, shading from adjacent structures, and your grid connection. No charge, no commitment required.
We produce a bespoke system design with yield modelling, self-consumption analysis, and a full 25-year financial projection. We present this clearly — you'll know exactly what you're agreeing to before signing anything.
We manage all pre-installation work: DNO notification and export applications, planning permission where required (most commercial roof installations are permitted development), and structural sign-off coordination.
Installation by vetted, MCS-certified contractors working to BS7671. Typically completed in 1–3 days depending on system size. Commissioning, metering, inverter configuration and monitoring setup included.